Additional Access Control System Requirements

Iskaan Tech • dubai, dubai emirate, United-Arab-Emirates • Posted June 28, 2026

Location dubai, dubai emirate
Job Type Full-time
Category Other
Posted June 28, 2026

Additional Access Control System Requirements

Break Down Posted On: June 19, 2026 Closing On: June 22, 2026

JOB REFERENCE: JB

Project Overview

Supply, installation, testing, commissioning, and integration of an additional Access Control System at Spica Residence, including all necessary hardware, software, cabling, accessories, and configuration works for basement, ground floor stair entrances, and main entrance locations. The system shall be integrated with the existing security infrastructure and Fire Alarm System.

Scope of Work

  • Supply and install Access Control Controllers for managing all access‑controlled doors.
  • Supply and install card readers at designated access points.
  • Supply and install electromagnetic locks, mounting brackets, and associated locking accessories.
  • Supply and install exit touch buttons for controlled egress.
  • Supply and configure network switches and connectors require...

Interested in this role?

Click the button below to start your application.

Apply Now