Apprentice - CCQ - Des Neiges Sud Wind Farm Project

Borea Construction • saint ferreol les neiges, qc, Canada • Posted June 14, 2026

Location saint ferreol les neiges, qc
Job Type Full-time
Category Other-General
Posted June 14, 2026

Find the right energy here and come generate something big with us!

Des Neiges - Secteur Sud wind farm is located in the unorganized territory of Lac-Jacques-Cartier in the MRC of Côte-de-Beaupré, south of the existing wind farms. It will include 57 wind turbines of 7 MW each, for a total capacity of 400 MW.

As part of this project, Borea is seeking motivated apprentices for the trades listed below and is committed to facilitating their participation in a Red Seal designated trade program. Borea offers apprentices the opportunity to join a diverse site team and enables them to be involved in multiple aspects of wind farm construction.
• Heavy Equipment Operator Apprentice - CCQ
Start Date: March 2026
• Excavator Operator Apprentice - CCQ
Start Date: March 2026
• Crane Operator Apprentice - CCQ
Start Date: March 2026
• Heavy Equipment Mechanic Apprentice - CCQ
Start date: March 2026
• Line Worker Apprentice(2...

Interested in this role?

Click the button below to start your application.

Apply Now